Pond desilting and re-profiling for Great Giddling Parich Council working with Wildlife Trust to create habitat area. Fabrication of steel shoes allows the installation of post and rail on to existing concrete slab to provide physical edge protection for pedestrians and cyclists. Steel mesh panel systems supplied and installed for school and local authorities. Removal of existing culvert, installation of new culvert to 60 tonne specification. Complete with handrails. Bank stabilisation with pre-planted coir roles.Extension to outside eating area for Hayes Hill Farm, Lee Valley works included installation of adequate concrete footings to hold the structure. 32 metre structure using steel and our Oak to construct footbridge over Tallington Weir works include removing existing failed structure. Replacement of existing failing concrete surface, supply and installation of new automated roller shutter doors and personnel door. Complete car park construction from highway specification entrance to the manufacture and installation of height restrictors these works were carried out for the Wildlife Trust at Warsley. Complete refurbishment of existing pond, removing sills and re-pointing brickwork. Including the supply and installation of a circulating pump.

Retail and Commercial / Industrial Property Maintenance

For over 10 years we have been providing a fully comprehensive maintenance service to numerous nationwide businesses.

These works include:

Onsite welding (mild steel, aluminium and stainless steel)

Civil works e.g. concreting, tarmacking, drainage installations.

In store / office refurbishment works, toilet refurbishments, flooring, suspended ceilings, installations of wall cladding such as white roc.

To complement our services we offer drainage solutions these include jetting, Roding and CCTV recording.

We are often described as a one stop shop; our dedicated team are fully trained and experienced in the works we provide.