Complete refurbishment of existing pond, removing sills and re-pointing brickwork. Including the supply and installation of a circulating pump. Pond desilting and re-profiling for Great Giddling Parich Council working with Wildlife Trust to create habitat area. Fabrication of steel shoes allows the installation of post and rail on to existing concrete slab to provide physical edge protection for pedestrians and cyclists.Extension to outside eating area for Hayes Hill Farm, Lee Valley works included installation of adequate concrete footings to hold the structure. 32 metre structure using steel and our Oak to construct footbridge over Tallington Weir works include removing existing failed structure. Replacement of existing failing concrete surface, supply and installation of new automated roller shutter doors and personnel door. Complete car park construction from highway specification entrance to the manufacture and installation of height restrictors these works were carried out for the Wildlife Trust at Warsley. Steel mesh panel systems supplied and installed for school and local authorities. Removal of existing culvert, installation of new culvert to 60 tonne specification. Complete with handrails. Bank stabilisation with pre-planted coir roles.

Contact Lattenbury Services

Chris Wisson: 07776 184 394

 

Peter Burton OBE: 07785 935 672

 

Telephone: 01480 830 224
Fax: 01480 831 312

 

Email: 

 

Web: www.lattenburyservices.co.uk

 

Correspondence Address:

Lattenbury Services 
Lattenbury Farm
Godmanchester
Huntingdon
Cambridgeshire
PE28 9PA

 

Registered in England 3413711.

 

Registered Office - not for general correspondence.

 

Lake House,
Market Hill,
Royston, 
Herts
SG8 9JN 

Contact Lattenbury Services.